Finally starting the sides! Cut the first 1″x6″x8′ in half and lined it up on the front side of the trailer. Since I had used bolts to attach the plywood deck I cut pockets for the heads to sit in so the board would sit flush with the plywood deck. Used carpenters square to try...
Author: SMLC-Webhost
New Trailer in the Works – Part 12
Deck is complete. Fastened down, D-Rings attached. The stakes for the sides have been given the first coat of red paint. The boards for the sides have been given half the varnish. Everything needs to dry now, then given the next coat!
New Trailer in the Works – Part 11
A rainy day, good to be in barn working on small, but time consuming trailer parts. I have six heavy duty D-Rings for tying down things in the trailer. Needed some good support for the back side so they don’t just pull out if someone cranks down on the strap/chain. I hunted up enough pieces...