Started working on the trailer deck today since the lumber was delivered! Took time to center it carefully on the trailer frame. Clamped it into position, then crawled underneath and marked all the holes and frame rails for drilling and routing. Since the trailer frame isn’t totally flat because the frame rails sit inside the...
Author: SMLC-Webhost
Mowing the Conservancy Farm Field #2
Finished the mowing of the Conservancy Farm SW field today. (2021-09-30) The final strip!
Mowing at the Conservancy Farm
Started mowing the Conservancy Farm SW field September 27, 2021. Aerial view of Conservancy Farm SW field after day two of mowing. Day one was really not much, a couple laps around the outside perimeter. Did not get a picture after the first day. The initial outside perimeter was exactly .5 mile, and took about...