The Conservancy Farm, far Northwest field after wetland was created, before mowing begins.
After Day 1 of mowing in the field.
Starting mowing the final 10 acre field. (On the west side here.)
You can just see the orange Kubota tractor at the top center. About 10 minutes to do one complete circuit of the field. Mower covers about 3.5 feet (42 inches) per track. So simple math… says, “a lot of circuits”!
To see the 360° panorama best, use the “double arrow” to make the picture full screen. Then use the mouse to move the picture around. The mouse wheel will also zoom in and out.